Nine design cores of precision metal stamping molds
Time : 2023-05-26 Click count : 2445

1、 Obtain necessary information

Based on relevant data, analyze the stamping processability and conduct process and standardization audits on the workpiece.

1) Obtain product part drawings that indicate specific technical requirements. Understand the shape, size, and precision requirements of the workpiece. The dimensions (size and position) of key holes, key surfaces, and the analysis and determination of the reference plane of the workpiece.

In fact, the process requirements for stamping parts are not absolute. Especially in the current situation of rapid development of stamping technology, it is necessary to comprehensively apply various stamping technologies according to the actual needs and possibilities of production, reasonably select stamping methods, correctly formulate stamping processes, and select mold structures, which can meet both the technical requirements of the product and the stamping process conditions.

2) Collect process cards for workpiece processing. Therefore, we can study the relationship between the previous and subsequent processes, as well as the processing requirements and assembly relationships that must be mutually guaranteed between processes.

3) Understand the production batch of the workpiece. The production of parts plays a decisive role in the economy of stamping processing. Therefore, based on the production batch of parts and the quality requirements of parts, it is necessary to determine the mold type, structure, materials, and other related matters. This analyzes the economy of mold processing technology and the rationality of public building production, and outlines the stamping steps.

4) Determine the specifications of the workpiece and raw materials (such as plates, strips, coils, waste, etc.), understand the properties and thickness of the materials, determine whether to sample with minimal waste based on the manufacturability of the parts, and preliminarily determine the specifications and accuracy level of the materials.

On the premise of meeting the requirements of usability and stamping performance, try to use inexpensive materials as much as possible.

5) Analyze the requirements for material fiber direction and burr direction in design and process.

6) The technical capability and equipment conditions for manufacturing molds in the analysis tool (mold) workshop, as well as the availability of standard mold parts.

7) Familiar with the equipment information or situation in the stamping workshop.

8) Study and digest the above data, and preliminarily conceive the mold structure scheme. When necessary, it is necessary to propose modification suggestions for the established product design and process flow, so as to better integrate the process flow of product design and mold design and manufacturing, and achieve a more complete effect.


2、 Determine the process plan and mold structure type

The determination of the process plan is an important step that should be carried out after the process analysis of stamping parts. It includes:

1) Based on the requirements of shape characteristics, dimensional accuracy, and workpiece surface quality, conduct process analysis to determine its main attributes and determine the nature of the basic processes, including cutting, punching, bending, drawing, flanging, and bulging. List all the processes required for stamping, which can generally be directly determined from the drawing requirements of the product parts.

2) Determine the number of processes based on process calculations. For drawing parts, the number of drawing times should also be calculated. Bending and punching parts should be processed one or more times according to their shape, size, and precision requirements.

3) Determine the process layout sequence based on deformation characteristics, dimensional accuracy requirements, and ease of operation. Such as rushing first and then bending, or bending first and then rushing, etc.

4) Based on factors such as production batch, size, precision requirements, mold manufacturing level, equipment capability, etc., combine the preliminarily sorted single processes with possible processes. Such as composite stamping process and continuous stamping process. Generally, thick materials, low precision, small batches, and large-sized stamped parts need to be produced at once, and simple molds should be selected. Progressive molds should be used for continuous production of thin materials, small-sized, and large-scale stamped parts; For stamping parts with high shape and position accuracy, composite molds should be used for stamping.

After determining the nature, sequence, and process combination of the process, the stamping process plan was determined. That is to say, the structural type of the mold in each process has been determined.


3、 Used for necessary process calculations

1) Design material layout and calculate blank dimensions.

2) Calculate the punching force (including punching force, bending force, deep drawing force, flanging force, bulging force, unloading force, pushing force, edge pressing force, etc.), and if necessary, calculate the punching work and power.

3) Calculate the pressure center of the mold.

4) Calculate or estimate the thickness of the main parts of the mold. Such as the thickness of the concave mold, convex mold fixing plate, cushion plate, and the free height of the unloading rubber or spring.

5) Determine the gap between the convex and concave molds, and calculate the dimensions of the working parts of the convex and concave molds.

6) For the deep drawing process, it is necessary to determine the deep drawing method (with or without edge rings), calculate the number of deep drawing cycles, and determine the semi-finished product size in the intermediate process.

For certain processes, such as continuous deep drawing of strip, special process calculations are required.


4、 Overall design of the mold

Based on the above analysis and calculation, the overall design of the mold structure is carried out (usually only a sketch is needed at this time), and the closing height of the mold is preliminarily calculated to roughly determine the external dimensions of the mold.


5、 Structural design of the main components of the mold

1) A part of the workpiece. The design and selection of fixed forms for structural types such as convex molds, concave molds, and convex concave molds.

2) Locate the component. There are many types of positioning devices commonly used in molds. The selection and design of adjustable positioning plates, fixed blocking pins, movable blocking pins, and fixed distance side edges should be based on specific circumstances.

In the continuous mold, it is also necessary to consider whether to use the initial stopper pin.

3) Unloading and propulsion device. Such as the selection and calculation of rigidity or elasticity, springs and rubber, etc.

4) Guiding components. For example, guide columns, guide sleeve guides or guide plate guides, middle guide columns, side rear guide columns or diagonal guide columns, sliding guide sleeves or ball guides with steel balls, etc.

5) Support and clamp parts, fasten parts. For example, the selection of mold handles, upper and lower mold seat structure types, etc.


6、 Selected stamping equipment

The selection of stamping equipment is an important component of process design and mold design. The reasonable selection of equipment has a great impact on ensuring the quality of workpieces, improving productivity, and ensuring operational safety, and also brings convenience to mold design.

The choice of stamping type mainly depends on the process requirements and production batch.

The determination of stamping equipment specifications mainly depends on process parameters and mold structure dimensions. For crank presses, the following requirements must be met:

1) The nominal pressure of the press must be greater than the stamping process force.

More precisely, the load curve of the stamping process must be lower than the allowable load curve of the press.

For deep drawn parts, it is necessary to calculate the drawing work.

2) The installation height of the press must meet the requirements of the clamping height.

3) The stroke of the press should meet the requirements of workpiece forming. For the press used in the deep drawing process, its stroke must be 2-2.5 times higher than the height of the workpiece during this process in order to insert the blank and remove the workpiece.

4) The size of the press table must be larger than the overall size of the mold base, and leave a position for fixing the mold. Generally, if each side is larger than 50-70 mm, the size of the leakage hole on the press table must be larger than the size of the workpiece (or waste).


7、 Draw a general drawing of the mold

The drawing of the overall mold drawing (including part and workpiece drawings) strictly follows the drawing standards (GB/T4457~GB/T4460 and GB/T131-1993). At the same time, in actual production, the layout of its drawings has formed certain habits based on the working characteristics of the mold and the needs of installation and adjustment.

The overall drawing of the mold includes:

1) Main view. Draw the outline of the mold at the work position. Usually, half of the blank positions are drawn before drawing the stamping (when the punch slider is at the top dead center position); The other half is drawn at the bottom dead center position after stamping, indicating that the workpiece has already been formed (or separated).

2) Top view. Usually, the top view of the half and the top view of the upper half are drawn by the other half. As needed, the top view of the lower part is sometimes fully drawn.

3) Side view, bottom view, and partial sectional view, etc. If necessary, draw a side view of the working position of the mold. Sometimes, the bottom view and partial sectional view of the upper part of the mold are also drawn in the upper right corner of the drawing.

4) Workpiece diagram. The general workpiece drawing is located in the upper right corner. For the work done on several sets of molds, in addition to drawing the workpiece diagram for this process, it is also necessary to draw the workpiece diagram for the previous process.

5) Layout diagram. For progressive dies, it is necessary to draw the layout, process arrangement sequence, and stamping content completed in each process step; The spacing between work steps, overlap value, and strip size should be marked. In the layout diagram of the punching die, the layout method, the size of the strip material, and the size of the overlap value should be marked.

6) List the parts list, specifying the materials and quantities. All standard parts should be selected according to specifications.

7) Technical requirements and instructions. Technical requirements include the press machine, equipment model, overall tolerance of the mold, assembly, installation and debugging, mold closure height, mold clearance, and other requirements.


8、 Draw part drawings for each non-standard component

All dimensions, tolerances, matching, shape and position tolerances, surface roughness, materials, heat treatment requirements, and other technical requirements should be indicated on the part drawing.


9、 Fill in the mold record card and prepare the stamping process document

For small-scale production, a process route list should be filled out; During large-scale production, it is necessary to create process cards and process cards for each component.

News Related news
日韩中文字幕精品视频_国产精品视频免费在线_欧美在线欧美在线_国产一区在线免费
av一区二区在线看| 国产精品91久久| 久久久女人电视剧免费播放下载| 亚洲综合日韩中文字幕v在线| 国产女人水真多18毛片18精品| 久久艳片www.17c.com| 蜜桃成人免费视频| 久久国产精品99国产精| 国产欧美一区二区三区视频| 精品久久蜜桃| 国产伦精品一区二区三区四区免费| 精品国产一区二区三区麻豆小说| 国产精品一区二区久久国产| 午夜免费在线观看精品视频| 久久久久久亚洲精品不卡4k岛国| 欧美在线视频网| 国产精品久久久久久久久电影网| 国产精品一区二区三区四区五区| 亚洲三区在线观看| 久久本道综合色狠狠五月| 欧美精品一区免费| 欧美极品欧美精品欧美视频| 99久热re在线精品视频| 日韩视频专区| 久久精品影视伊人网| 国产综合中文字幕| 一级特黄妇女高潮| 久久精品二区| 国产精品视频网址| 欧美激情图片区 | 午夜精品免费视频| 日韩在线播放av| 国产日韩中文字幕在线| 无码人妻精品一区二区三区66 | 国产精品吊钟奶在线| www.欧美黄色| 青青视频免费在线| 影音先锋欧美在线| 久久精品ww人人做人人爽| 蜜桃视频在线观看91| 亚洲91精品在线亚洲91精品在线| 久久天天躁狠狠躁夜夜躁| 国产裸体免费无遮挡| 亚洲v国产v| 国产精品十八以下禁看| 成人精品一区二区三区| 热re99久久精品国产66热| 欧美猛交ⅹxxx乱大交视频| 久久久性生活视频| 国产亚洲欧美在线视频| 日韩一二区视频| 中文字幕日韩一区二区三区不卡| 久久久噜噜噜久噜久久| 国产精品一区专区欧美日韩| 人人妻人人澡人人爽欧美一区双| 色999五月色| 国产二区视频在线| 欧美一区二区综合| 色综合天天综合网国产成人网| 91免费看片在线| 日韩欧美三级一区二区| 欧美日韩亚洲一区二区三区四区| 精品国产一区二区三 | 亚洲伊人久久综合| 国产精品免费福利| 久久久久久高清| 国产欧美一区二区三区在线| 青青草成人网| 亚洲不卡一卡2卡三卡4卡5卡精品| 精品乱色一区二区中文字幕| 久久精品欧美视频| 久久久久资源| 久久人人爽人人爽人人av | 国产精品免费看一区二区三区| 国产精品678| 国产精品永久在线| 国产网站免费在线观看| 男人亚洲天堂网| 日韩免费一区二区三区| 天天好比中文综合网| 亚洲最大成人在线| 一区二区三区在线观看www| 国产精品久久久久一区二区| 久热国产精品视频| 久久激情五月丁香伊人| 日韩视频中文字幕| 国产h视频在线播放| 国产高清在线不卡| 久久久亚洲国产天美传媒修理工| 粉嫩精品一区二区三区在线观看 | 国产精品69精品一区二区三区| 国产日本一区二区三区| 麻豆久久久av免费| 激情成人开心网| 欧美凹凸一区二区三区视频| 日韩免费在线观看av| 日本福利视频网站| 日本精品久久久久影院| 日本一本中文字幕| 日本免费成人网| 日本精品一区二区三区不卡无字幕| 午夜精品一区二区三区av | 国产视色精品亚洲一区二区| 亚洲成熟丰满熟妇高潮xxxxx| 亚洲一区二区不卡视频| 欧美日韩国产第一页| 综合色婷婷一区二区亚洲欧美国产| 久久99精品国产99久久6尤物| 欧美激情乱人伦一区| 青青草原一区二区| 亚洲自拍欧美另类| 欧美巨大黑人极品精男| 日韩视频免费在线观看| 国产成人av在线| 久久久久久高清| 久久久一本精品99久久精品 | 欧美亚州一区二区三区| 日本一区二区三区在线播放| 亚洲成人一区二区三区| 一区二区三区观看| 伊人久久99| 一区二区三区四区久久| 久久99精品久久久久久琪琪| 国产精品入口芒果| 国产精品欧美激情在线观看| 国产精品日韩在线| 国产精品视频午夜| 国产精品久久久久久久久久尿| 久久久国产精品视频| 国产成人精品优优av| 日韩中文有码在线视频| 久久久999成人| 国产精品免费一区二区三区在线观看| 日韩在线视频免费观看高清中文 | 欧美精彩一区二区三区| 青青在线免费观看视频| 日韩暖暖在线视频| 久久久女女女女999久久| 成人国产精品色哟哟| 97碰在线视频| 色阁综合伊人av| 欧美精品做受xxx性少妇| 亚洲成人精品电影在线观看| 日韩欧美三级一区二区| 国产美女作爱全过程免费视频| 91成人福利在线| 久久久综合香蕉尹人综合网| 九一国产精品视频| 国产成人精品综合久久久| 国产精品久久亚洲| 欧美精品久久久久久久久| 亚洲一区二区在线播放| 亚洲欧美日韩在线综合| 日本一区视频在线| 欧美一区深夜视频| 国产午夜精品一区| 成人美女免费网站视频| 国产精品99一区| 色偷偷噜噜噜亚洲男人| 国产精品人成电影在线观看| 久久99精品久久久久久噜噜| 欧美不卡在线一区二区三区| 99久久自偷自偷国产精品不卡| 久久久999国产精品| 婷婷五月色综合| 国产日产久久高清欧美一区| 久久国产欧美精品| 美日韩精品视频免费看| 日韩欧美一区三区| www.久久草| 欧美猛少妇色xxxxx| 蜜桃传媒一区二区| 北条麻妃在线视频观看| 日韩在线视频一区| 一区二区三区四区不卡| 日本不卡视频在线播放| 国产在线播放一区二区| 91传媒视频免费| 国产成人精品视频免费看| 欧美精品免费播放| 日本欧美中文字幕| 国产日韩精品一区观看| 77777亚洲午夜久久多人| 国产精品网站免费| 亚洲高清不卡一区| 狠狠色综合色区| 国产精品99久久免费黑人人妻| 啊v视频在线一区二区三区| 一区二区三区我不卡| 欧美精品国产精品久久久| 91久久久久久久久久久| 国产精品久久久久久网站| 日韩av大全| 成人国产精品av| 国产精品嫩草影院一区二区| 日韩在线电影一区| 欧美久久久久久久久久久久久| 97精品在线视频| 操91在线视频| 日本福利视频网站|