1、 Standard structure and function of punching die

Punching die: refers to a general term for molds such as punching, cutting, and trimming.

Before starting the structural design of the mold, the above standard structure should be determined first. When special parts (such as thick parts or high hardness materials) are not suitable for using the above standard structure, two heat treatment pads can be added on this basis.

The working process of the punching die is divided into the following parts according to the movement sequence of the punch press:

1. The punch slider drives the upper mold to move downwards from the high point of the open mold state, while the upper and lower molds are not in contact.

2. When the upper striking plate comes into contact with the lower die punch, the upper striking plate stops moving, and the punch slider continues to move downward. The upper die release spring begins to compress, and the spring presses against the upper striking plate, compressing the stamped part. After a certain distance, the punch installed on the upper clamp plate comes into contact with the punch.

3. The punch slider continues to move downwards, and when it approaches the bottom dead center (closed mold state), all the punches enter the lower mold hole to complete the punching.

4. Punching waste falls from the lower template onto the lower cushion plate and onto the leakage hole of the lower mold seat.

5. After the punch passes through the bottom dead center, the punch slider drives the upper mold to start picking up. At this point, due to the release of pressure, under the action of the upper die release spring force, the upper punching plate will eject the punch from the punch, completing the material dropping. Lower the top material pin of the template and top it up, so that the punch piece returns to its original position.

6. The punch slider drives the upper mold to continue upward, returning to the high point when the mold was opened, completing the stamping process in one go.

be careful:

1. The height of the closed mold should conform to the corresponding height of the closed mold of the selected punch press.

2. When the outer positioning block and inner positioning pin are used simultaneously, the outer positioning is coarse and slightly higher than the inner positioning.

3. The corresponding thickness of each template should refer to and comply with the Flextronics Mold Design Standards.


2、 Design of punching die

1) Enter command T1 in the CAD command bar, and the following dialog box will pop up. Manually enter the relevant information of the template and the closing height, and then click the OK button. (The information entered here will help us automatically generate the content of TOMB after the design is completed)

2) Determine the size of the template based on the layout diagram and copy it to the corresponding layer. Enter command T2 in the CAD command bar, and the following dialog box will appear. Then click the corresponding button to automatically generate template elements for the corresponding layer. If the template is relatively large, you can complete the partitioning work later.

3) Start drawing the punching, positioning, avoidance position and other work contents, and draw detailed side views of the punching, positioning and other work contents in the SID VIEW previously drawn. After completion, the work of dividing the board can be carried out. If the size of the template does not exceed the dimensions specified in the Flextronics mold design standards, there is no need to divide the template. By clicking the Generate Punch button in the CAD toolbar, a dialog box can be obtained, and automatic drawing of punching can be completed by manually entering information.

If the punch to be stretched is not suitable for automatic stretching generation, such as large irregular punch heads that need to be fixed with screws. You can click the button on the toolbar to call the dialog box, and then automatically complete any form of automatic drawing of the strengthening punch.

4) Layout of components such as top material pins, floating blocks, and limit blocks: Top material pins, floating blocks, limit blocks, and other components must use the standard pattern in the template file, and the limit blocks should preferably be square. When using limit blocks in engineering molds, they must be divided into upper and lower parts, and the size value of B must not exceed the height of the lower template. The dimension height of A B must be 0.1 millimeters smaller than the actual closed mold height value.

5) Adjust the size of the upper and lower load-bearing plates, spring plates, and the position of the upper and lower pads, and draw a feeding groove on the lower pad. The feeding groove on the lower pad is clamped at a 60 degree angle.

6) Layout of hardware components and closed molds; When arranging hardware parts (such as screws, pins, spindles, etc.), a dialog box will pop up, requiring manual input of corresponding specifications (such as size, length, etc.) information for the hardware parts. The list of hardware parts will be automatically generated based on this information. The size of the template fixing screws should be M10 with a spacing of 150-250 millimeters.

7) Perform self inspection on the structure and check one by one according to the final design re inspection form to reduce routine errors. After completing this form, it needs to be kept properly until all drawings are signed and approved.

8) Add a frame to the image file, fill in the frame content, and compile TOMB;

Before starting the design, we carefully edited the relevant information of each template. Now, we can use the Q-TOMR button in the dialog box to quickly complete TOMB compilation for templates only. Then other functional buttons can be used to complete the compilation of the relevant TOMB parts.

9) Generate BOM tables such as STOCK LIST, STANDARD LIST, SCREW LIST, PERF CHART, etc; Use the STOCK LIST.STANDARD LIST and SCREW LIST buttons in the dialog box to automatically generate the corresponding tables.

Clicking the button on the toolbar will display a dialog box, and then clicking the "PERF LIST" button will automatically generate a list of all punching related items.

10) Check and dismantle drawings

After completing the overall layout design and generating all tables, it is necessary to submit the design drawing inspection record table and the entire design to LEADER for inspection, and then modify any unreasonable parts.

After the modification is completed, the drawing can be disassembled, and the specific operation method needs to refer to the LDS course textbook and Flextronics mold design standards.


3、 Sign off and produce drawings

1) Check whether the disassembled and printed drawing files are newly revised drawing files, whether the drawings are consistent with the drawing files, and whether there are any omissions in the saved drawing files. Check whether the drawing files and drawings are complete. Hand it over to the supervisor for signature.

2) Put the signed electronic drawings into the exchange area, fill out the drawing distribution and bidding list to complete the design.

News Related news
日韩中文字幕精品视频_国产精品视频免费在线_欧美在线欧美在线_国产一区在线免费
国产主播精品在线| 欧美高清一区二区| 日本免费黄视频| 99热成人精品热久久66| 国产精品第七影院| 欧美精品一区二区三区在线四季| 91成人免费观看网站| 精品久久久久久久免费人妻| 欧美亚洲国产另类| 国产成人福利视频| 亚洲激情电影在线| 97精品国产97久久久久久| 一区二区三区一级片| 日本10禁啪啪无遮挡免费一区二区| 99国产精品久久久久老师| 欧美精品videos| 福利视频一区二区三区四区| 精品国产91亚洲一区二区三区www| 黄色特一级视频| 日韩在线观看免费av| 人妻av无码专区| 久久久久久免费看| 欧美一区观看| 国产精品爽黄69天堂a| 色阁综合av| 国产成人精品999| 日韩最新中文字幕| 91国产美女视频| 亚洲a级在线观看| 91精品国产色综合久久不卡98| 亚洲综合五月天| 91久久精品久久国产性色也91| 永久久久久久| 97精品国产91久久久久久| 亚洲精品蜜桃久久久久久| 成人免费91在线看| 亚洲一区在线直播| 久久久综合香蕉尹人综合网| 视频一区二区视频| 色偷偷91综合久久噜噜| 欧美亚洲丝袜| 另类美女黄大片| 国产女同一区二区| 一本色道久久综合亚洲精品婷婷| 99久久精品免费看国产四区| 亚洲aa中文字幕| 久久久久久久久中文字幕| 热99久久精品| 欧美成人亚洲成人| 成人免费毛片网| 日韩欧美一级在线| 国产精品国产一区二区| 99视频精品免费| 秋霞无码一区二区| 久热精品视频在线免费观看| 91精品在线国产| 日韩欧美激情一区二区| 久久国产精品99国产精| 丰满人妻中伦妇伦精品app| 亚洲aⅴ日韩av电影在线观看| 久久久久久久久久久免费视频| 男女视频一区二区三区| 一本色道久久99精品综合| 久久国产精品网| 国产亚洲情侣一区二区无| 亚洲欧美一区二区原创| 国产精品视频二| www.国产二区| 欧美日韩视频免费在线观看 | 蜜臀久久99精品久久久无需会员 | 日韩久久久久久久| 国产精品成人观看视频国产奇米| 97成人在线免费视频| 黄页网站大全在线观看| 亚洲精品在线观看免费| 国产精品情侣自拍| 69av视频在线播放| 欧美精品色婷婷五月综合| 一区二区精品在线| 日韩一区在线视频| 国产欧美精品久久久| 日本不卡在线观看视频| 欧美日韩第一视频| 精品国模在线视频| 久久亚洲精品欧美| 国产精品亚洲自拍| 狠狠色综合欧美激情| 午夜欧美性电影| 久久99亚洲热视| 久久精品亚洲国产| 国产二区不卡| 国产精选久久久久久| 青青视频免费在线| 欧美一区二区三区综合| 国产精品初高中精品久久| 久久久精品视频成人| 久久久精品动漫| 99爱精品视频| 国产精品一区二| 国产自产精品| 欧美中文在线免费| 日本福利视频一区| 午夜欧美大片免费观看| 中文字幕在线乱| 久久亚洲影音av资源网| 久久精品色欧美aⅴ一区二区| 国产不卡在线观看| 91美女片黄在线观| www国产亚洲精品| 国产三级中文字幕| 国产主播精品在线| 国产亚洲欧美一区二区三区| 国产中文字幕免费观看| 欧美亚洲成人精品| 欧美日韩国产精品一卡| 欧美污视频久久久| 欧美中文字幕精品| 欧美性猛交久久久乱大交小说| 日韩免费视频在线观看| 日韩美女av在线免费观看| 日韩欧美亚洲日产国产| 日本不卡高字幕在线2019| 少妇性饥渴无码a区免费| 亚洲在线一区二区| 亚洲国产激情一区二区三区| 亚洲va男人天堂| 日日鲁鲁鲁夜夜爽爽狠狠视频97| 亚洲**2019国产| 日本欧洲国产一区二区| 日本在线播放一区| 日韩激情视频| 欧美久久电影| 国内精品视频在线| 免费观看精品视频| 国产欧亚日韩视频| www国产亚洲精品| 国产精品99蜜臀久久不卡二区| 91久久久久久久久| 国产成人综合久久| 久久久久一区二区三区| 国产成人精品一区二区| 国产精品初高中精品久久| 色与欲影视天天看综合网| 一本一本a久久| 日本久久久久久久久久久| 欧美极品一区二区| 国产欧美精品一区二区三区介绍| 高清在线观看免费| 国产高清在线精品一区二区三区| 日韩一级黄色av| 国产精品久久久久9999小说| 欧美激情第1页| 亚洲高清视频一区| 欧美一区免费视频| 国产欧美日韩视频一区二区三区| 91精品视频网站| 久久久av一区| 久久成人精品视频| 五月天婷亚洲天综合网鲁鲁鲁| 日韩欧美视频一区二区三区四区| 激情小视频网站| 97人人模人人爽视频一区二区 | 亚洲va久久久噜噜噜| 热久久免费国产视频| 国内自拍欧美激情| 国产日本欧美一区| 国产高清自拍一区| 欧美伦理91i| 日韩中文字幕组| 蜜桃在线一区二区三区精品| 超碰97在线播放| 日韩少妇与小伙激情| 久久久久久国产| 日韩美女av在线免费观看| 国产欧美日韩视频一区二区三区 | 69**夜色精品国产69乱| 国产精品无码专区在线观看| 国产精品国产三级国产aⅴ浪潮| 亚洲欧洲日韩综合二区| 欧美成人一区二区在线观看| 91传媒视频免费| 欧美xxxx综合视频| 日本久久久久久久久久久| 国产欧美一区二区三区久久| 久久久久免费视频| 亚洲综合在线中文字幕| 免费人成在线观看视频播放| 国产精品96久久久久久又黄又硬| 国产精品久久不能| 日本欧美视频在线观看| 国产免费成人av| 久久精品亚洲热| 亚洲v日韩v综合v精品v| 国产欧美久久久久久| 久久精品人人爽| 欧美一区二区三区四区在线观看地址| 免费av在线一区二区| 久久久久久久久一区二区| 亚洲一区二区三区精品在线观看| 韩日精品中文字幕|