Nine design cores of precision metal stamping molds
Time : 2023-05-26 Click count : 2446

1、 Obtain necessary information

Based on relevant data, analyze the stamping processability and conduct process and standardization audits on the workpiece.

1) Obtain product part drawings that indicate specific technical requirements. Understand the shape, size, and precision requirements of the workpiece. The dimensions (size and position) of key holes, key surfaces, and the analysis and determination of the reference plane of the workpiece.

In fact, the process requirements for stamping parts are not absolute. Especially in the current situation of rapid development of stamping technology, it is necessary to comprehensively apply various stamping technologies according to the actual needs and possibilities of production, reasonably select stamping methods, correctly formulate stamping processes, and select mold structures, which can meet both the technical requirements of the product and the stamping process conditions.

2) Collect process cards for workpiece processing. Therefore, we can study the relationship between the previous and subsequent processes, as well as the processing requirements and assembly relationships that must be mutually guaranteed between processes.

3) Understand the production batch of the workpiece. The production of parts plays a decisive role in the economy of stamping processing. Therefore, based on the production batch of parts and the quality requirements of parts, it is necessary to determine the mold type, structure, materials, and other related matters. This analyzes the economy of mold processing technology and the rationality of public building production, and outlines the stamping steps.

4) Determine the specifications of the workpiece and raw materials (such as plates, strips, coils, waste, etc.), understand the properties and thickness of the materials, determine whether to sample with minimal waste based on the manufacturability of the parts, and preliminarily determine the specifications and accuracy level of the materials.

On the premise of meeting the requirements of usability and stamping performance, try to use inexpensive materials as much as possible.

5) Analyze the requirements for material fiber direction and burr direction in design and process.

6) The technical capability and equipment conditions for manufacturing molds in the analysis tool (mold) workshop, as well as the availability of standard mold parts.

7) Familiar with the equipment information or situation in the stamping workshop.

8) Study and digest the above data, and preliminarily conceive the mold structure scheme. When necessary, it is necessary to propose modification suggestions for the established product design and process flow, so as to better integrate the process flow of product design and mold design and manufacturing, and achieve a more complete effect.


2、 Determine the process plan and mold structure type

The determination of the process plan is an important step that should be carried out after the process analysis of stamping parts. It includes:

1) Based on the requirements of shape characteristics, dimensional accuracy, and workpiece surface quality, conduct process analysis to determine its main attributes and determine the nature of the basic processes, including cutting, punching, bending, drawing, flanging, and bulging. List all the processes required for stamping, which can generally be directly determined from the drawing requirements of the product parts.

2) Determine the number of processes based on process calculations. For drawing parts, the number of drawing times should also be calculated. Bending and punching parts should be processed one or more times according to their shape, size, and precision requirements.

3) Determine the process layout sequence based on deformation characteristics, dimensional accuracy requirements, and ease of operation. Such as rushing first and then bending, or bending first and then rushing, etc.

4) Based on factors such as production batch, size, precision requirements, mold manufacturing level, equipment capability, etc., combine the preliminarily sorted single processes with possible processes. Such as composite stamping process and continuous stamping process. Generally, thick materials, low precision, small batches, and large-sized stamped parts need to be produced at once, and simple molds should be selected. Progressive molds should be used for continuous production of thin materials, small-sized, and large-scale stamped parts; For stamping parts with high shape and position accuracy, composite molds should be used for stamping.

After determining the nature, sequence, and process combination of the process, the stamping process plan was determined. That is to say, the structural type of the mold in each process has been determined.


3、 Used for necessary process calculations

1) Design material layout and calculate blank dimensions.

2) Calculate the punching force (including punching force, bending force, deep drawing force, flanging force, bulging force, unloading force, pushing force, edge pressing force, etc.), and if necessary, calculate the punching work and power.

3) Calculate the pressure center of the mold.

4) Calculate or estimate the thickness of the main parts of the mold. Such as the thickness of the concave mold, convex mold fixing plate, cushion plate, and the free height of the unloading rubber or spring.

5) Determine the gap between the convex and concave molds, and calculate the dimensions of the working parts of the convex and concave molds.

6) For the deep drawing process, it is necessary to determine the deep drawing method (with or without edge rings), calculate the number of deep drawing cycles, and determine the semi-finished product size in the intermediate process.

For certain processes, such as continuous deep drawing of strip, special process calculations are required.


4、 Overall design of the mold

Based on the above analysis and calculation, the overall design of the mold structure is carried out (usually only a sketch is needed at this time), and the closing height of the mold is preliminarily calculated to roughly determine the external dimensions of the mold.


5、 Structural design of the main components of the mold

1) A part of the workpiece. The design and selection of fixed forms for structural types such as convex molds, concave molds, and convex concave molds.

2) Locate the component. There are many types of positioning devices commonly used in molds. The selection and design of adjustable positioning plates, fixed blocking pins, movable blocking pins, and fixed distance side edges should be based on specific circumstances.

In the continuous mold, it is also necessary to consider whether to use the initial stopper pin.

3) Unloading and propulsion device. Such as the selection and calculation of rigidity or elasticity, springs and rubber, etc.

4) Guiding components. For example, guide columns, guide sleeve guides or guide plate guides, middle guide columns, side rear guide columns or diagonal guide columns, sliding guide sleeves or ball guides with steel balls, etc.

5) Support and clamp parts, fasten parts. For example, the selection of mold handles, upper and lower mold seat structure types, etc.


6、 Selected stamping equipment

The selection of stamping equipment is an important component of process design and mold design. The reasonable selection of equipment has a great impact on ensuring the quality of workpieces, improving productivity, and ensuring operational safety, and also brings convenience to mold design.

The choice of stamping type mainly depends on the process requirements and production batch.

The determination of stamping equipment specifications mainly depends on process parameters and mold structure dimensions. For crank presses, the following requirements must be met:

1) The nominal pressure of the press must be greater than the stamping process force.

More precisely, the load curve of the stamping process must be lower than the allowable load curve of the press.

For deep drawn parts, it is necessary to calculate the drawing work.

2) The installation height of the press must meet the requirements of the clamping height.

3) The stroke of the press should meet the requirements of workpiece forming. For the press used in the deep drawing process, its stroke must be 2-2.5 times higher than the height of the workpiece during this process in order to insert the blank and remove the workpiece.

4) The size of the press table must be larger than the overall size of the mold base, and leave a position for fixing the mold. Generally, if each side is larger than 50-70 mm, the size of the leakage hole on the press table must be larger than the size of the workpiece (or waste).


7、 Draw a general drawing of the mold

The drawing of the overall mold drawing (including part and workpiece drawings) strictly follows the drawing standards (GB/T4457~GB/T4460 and GB/T131-1993). At the same time, in actual production, the layout of its drawings has formed certain habits based on the working characteristics of the mold and the needs of installation and adjustment.

The overall drawing of the mold includes:

1) Main view. Draw the outline of the mold at the work position. Usually, half of the blank positions are drawn before drawing the stamping (when the punch slider is at the top dead center position); The other half is drawn at the bottom dead center position after stamping, indicating that the workpiece has already been formed (or separated).

2) Top view. Usually, the top view of the half and the top view of the upper half are drawn by the other half. As needed, the top view of the lower part is sometimes fully drawn.

3) Side view, bottom view, and partial sectional view, etc. If necessary, draw a side view of the working position of the mold. Sometimes, the bottom view and partial sectional view of the upper part of the mold are also drawn in the upper right corner of the drawing.

4) Workpiece diagram. The general workpiece drawing is located in the upper right corner. For the work done on several sets of molds, in addition to drawing the workpiece diagram for this process, it is also necessary to draw the workpiece diagram for the previous process.

5) Layout diagram. For progressive dies, it is necessary to draw the layout, process arrangement sequence, and stamping content completed in each process step; The spacing between work steps, overlap value, and strip size should be marked. In the layout diagram of the punching die, the layout method, the size of the strip material, and the size of the overlap value should be marked.

6) List the parts list, specifying the materials and quantities. All standard parts should be selected according to specifications.

7) Technical requirements and instructions. Technical requirements include the press machine, equipment model, overall tolerance of the mold, assembly, installation and debugging, mold closure height, mold clearance, and other requirements.


8、 Draw part drawings for each non-standard component

All dimensions, tolerances, matching, shape and position tolerances, surface roughness, materials, heat treatment requirements, and other technical requirements should be indicated on the part drawing.


9、 Fill in the mold record card and prepare the stamping process document

For small-scale production, a process route list should be filled out; During large-scale production, it is necessary to create process cards and process cards for each component.

News Related news
日韩中文字幕精品视频_国产精品视频免费在线_欧美在线欧美在线_国产一区在线免费
久久久久久久久网站| 日韩欧美一区二区三区四区五区 | 99精品国产高清在线观看| 一本久道综合色婷婷五月| 草b视频在线观看| 一区二区三区欧美成人| 91免费视频网站在线观看| 午夜精品久久久内射近拍高清| 久久亚洲a v| 欧美专区在线观看| 国产精品久久久久久av下载红粉| 国产视频999| 亚洲在线不卡| 久久精品美女| 韩国一区二区av| 中文字幕日韩精品一区二区| 国产精品91一区| 极品粉嫩国产18尤物| 综合色婷婷一区二区亚洲欧美国产| 99视频精品免费| 欧美一级免费看| 波霸ol色综合久久| 精品视频免费在线播放| 中文字幕日韩精品一区二区| 久久男人资源视频| 精品少妇人妻av免费久久洗澡| 亚洲永久在线观看| 日韩在线播放一区| 成人一区二区在线| 欧美亚州在线观看| 精品国产av无码一区二区三区| 久久亚洲精品欧美| 国产香蕉一区二区三区| 日本精品一区二区三区不卡无字幕| 国产精品久久久久久av福利| 成人精品久久久| 青草青草久热精品视频在线网站| 久久成人免费视频| 久久国产精品网| 国产精品一区二区三区四区五区| 日韩精品成人一区二区在线观看| 中文视频一区视频二区视频三区| 日韩中文在线视频| 高清一区二区三区视频| 黄色一级视频播放| 日本一区高清不卡| 久久久久国产精品一区| 久久精品久久久久久| 久久全国免费视频| www.日本在线视频| 国模私拍视频一区| 人人澡人人澡人人看欧美| 亚洲色欲综合一区二区三区| 国产精品久久久久7777| www.色综合| 国产成人一区二区三区免费看| 国产美女三级视频| 免费日韩中文字幕| 人妻少妇精品久久| 偷拍视频一区二区| 永久免费看av| 欧美精品免费在线| 国产精品久久一区| 国产精品网站大全| 色吧影院999| 91九色在线观看| 国产精选在线观看91| 免费看污久久久| 精品日产一区2区三区黄免费 | 免费精品视频一区| 人妻久久久一区二区三区| 亚洲97在线观看| 中文视频一区视频二区视频三区| 久久亚洲综合国产精品99麻豆精品福利 | 久久久一二三四| 91极品视频在线| 人人妻人人澡人人爽欧美一区 | 97国产精品免费视频| 成人亚洲欧美一区二区三区| 国产日本欧美在线| 国产又大又硬又粗| 国产综合久久久久| 国产一区二区高清视频| 欧美日韩无遮挡| 青青草免费在线视频观看| 日本精品久久久久中文字幕| 亚洲精品一卡二卡三卡四卡 | 欧美午夜精品久久久久免费视| 视频一区二区三区在线观看| 亚洲欧美久久久久一区二区三区| 在线视频福利一区| 在线观看一区欧美| 亚洲五码在线观看视频| 亚洲午夜精品久久久久久人妖| 欧美极品在线播放| 亚洲一区中文字幕| 午夜一区二区三视频在线观看| 亚洲高清资源综合久久精品| 亚洲欧美精品| 色一情一乱一伦一区二区三区丨| 亚洲va韩国va欧美va精四季| 婷婷五月综合缴情在线视频| 日本最新高清不卡中文字幕 | 成人毛片100部免费看| 成人国产精品色哟哟| 97国产一区二区精品久久呦| 99国产盗摄| 国产成人综合亚洲| 久久久久久国产精品一区| 日韩三级成人av网| 国产精品久久久久久久电影| 精品综合久久久久久97| 亚洲尤物视频网| 日本一区二区高清视频| 欧美在线一级va免费观看| 国内精品模特av私拍在线观看| 国产综合 伊人色| caoporn国产精品免费公开| 久久伊人资源站| 精品国偷自产在线视频| 欧美精品免费在线观看| 永久免费看av| 日本欧美一级片| 免费国产成人看片在线| 成人精品一二区| 国产成人精品国内自产拍免费看| 久久久精品视频成人| 欧美精品一区在线播放| 亚洲不卡中文字幕| 青春草在线视频免费观看| 国产日韩欧美夫妻视频在线观看| 91福利视频网| 国产精品视频导航| 亚洲熟妇av一区二区三区| 欧洲黄色一级视频| 国产毛片视频网站| 91干在线观看| 国产精品久久色| 亚洲在线观看视频网站| 欧美在线一级视频| caopor在线视频| 久久精品国产69国产精品亚洲| 久久99视频免费| 日本精品免费在线观看| 国产欧美一区二区在线播放| 国产激情片在线观看| 欧美成人性色生活仑片| 无码av天堂一区二区三区| 国模杨依粉嫩蝴蝶150p| 国产精品69页| 操人视频在线观看欧美| 午夜精品区一区二区三| 极品尤物一区二区三区| 2019日本中文字幕| 欧美大成色www永久网站婷| 日本伊人精品一区二区三区介绍| 国产三区精品| 日韩视频精品在线| 一区二区高清视频| 韩国三级日本三级少妇99| 久青草视频在线播放| 欧美成年人网站| 欧美亚洲另类在线| 久久青草精品视频免费观看| 色中色综合影院手机版在线观看| 欧洲日韩成人av| 97碰碰碰免费色视频| 精品免费久久久久久久| 欧美亚洲另类制服自拍| 久久久久国产精品熟女影院| 中文字幕人妻熟女人妻洋洋| 欧美日韩在线播放一区二区| 久久久性生活视频| 一本色道久久99精品综合| 国产在线精品一区二区三区》| 久久久久亚洲av无码专区喷水| 亚洲在线不卡| 国产男女猛烈无遮挡91| 国产精品高潮呻吟久久av无限 | 成人a免费视频| 欧美精品一本久久男人的天堂| 日韩精品第一页| 久久无码高潮喷水| 亚洲免费不卡| 国产伦精品一区| 欧美成人久久久| 国内久久久精品| 久久精品一偷一偷国产| 热草久综合在线| 久久久久一区二区| 日韩视频免费播放| 久久国产精品一区二区三区| 欧美一级片在线播放| 69av在线播放| 亚洲精品日韩av| 97国产在线视频| 亚洲精品乱码久久久久久自慰| 国产精品一区二区女厕厕| 久久久久久97| 成人免费淫片aa视频免费|