1、 Obtain necessary information

Based on relevant data, analyze the stamping processability and conduct process and standardization audits on the workpiece.

1) Obtain product part drawings that indicate specific technical requirements. Understand the shape, size, and precision requirements of the workpiece. The dimensions (size and position) of key holes, key surfaces, and the analysis and determination of the reference plane of the workpiece.

In fact, the process requirements for stamping parts are not absolute. Especially in the current situation of rapid development of stamping technology, it is necessary to comprehensively apply various stamping technologies according to the actual needs and possibilities of production, reasonably select stamping methods, correctly formulate stamping processes, and select mold structures, which can meet both the technical requirements of the product and the stamping process conditions.

2) Collect process cards for workpiece processing. Therefore, we can study the relationship between the previous and subsequent processes, as well as the processing requirements and assembly relationships that must be mutually guaranteed between processes.

3) Understand the production batch of the workpiece. The production of parts plays a decisive role in the economy of stamping processing. Therefore, based on the production batch of parts and the quality requirements of parts, it is necessary to determine the mold type, structure, materials, and other related matters. This analyzes the economy of mold processing technology and the rationality of public building production, and outlines the stamping steps.

4) Determine the specifications of the workpiece and raw materials (such as plates, strips, coils, waste, etc.), understand the properties and thickness of the materials, determine whether to sample with minimal waste based on the manufacturability of the parts, and preliminarily determine the specifications and accuracy level of the materials.

On the premise of meeting the requirements of usability and stamping performance, try to use inexpensive materials as much as possible.

5) Analyze the requirements for material fiber direction and burr direction in design and process.

6) The technical capability and equipment conditions for manufacturing molds in the analysis tool (mold) workshop, as well as the availability of standard mold parts.

7) Familiar with the equipment information or situation in the stamping workshop.

8) Study and digest the above data, and preliminarily conceive the mold structure scheme. When necessary, it is necessary to propose modification suggestions for the established product design and process flow, so as to better integrate the process flow of product design and mold design and manufacturing, and achieve a more complete effect.


2、 Determine the process plan and mold structure type

The determination of the process plan is an important step that should be carried out after the process analysis of stamping parts. It includes:

1) Based on the requirements of shape characteristics, dimensional accuracy, and workpiece surface quality, conduct process analysis to determine its main attributes and determine the nature of the basic processes, including cutting, punching, bending, drawing, flanging, and bulging. List all the processes required for stamping, which can generally be directly determined from the drawing requirements of the product parts.

2) Determine the number of processes based on process calculations. For drawing parts, the number of drawing times should also be calculated. Bending and punching parts should be processed one or more times according to their shape, size, and precision requirements.

3) Determine the process layout sequence based on deformation characteristics, dimensional accuracy requirements, and ease of operation. Such as rushing first and then bending, or bending first and then rushing, etc.

4) Based on factors such as production batch, size, precision requirements, mold manufacturing level, equipment capability, etc., combine the preliminarily sorted single processes with possible processes. Such as composite stamping process and continuous stamping process. Generally, thick materials, low precision, small batches, and large-sized stamped parts need to be produced at once, and simple molds should be selected. Progressive molds should be used for continuous production of thin materials, small-sized, and large-scale stamped parts; For stamping parts with high shape and position accuracy, composite molds should be used for stamping.

After determining the nature, sequence, and process combination of the process, the stamping process plan was determined. That is to say, the structural type of the mold in each process has been determined.


3、 Used for necessary process calculations

1) Design material layout and calculate blank dimensions.

2) Calculate the punching force (including punching force, bending force, deep drawing force, flanging force, bulging force, unloading force, pushing force, edge pressing force, etc.), and if necessary, calculate the punching work and power.

3) Calculate the pressure center of the mold.

4) Calculate or estimate the thickness of the main parts of the mold. Such as the thickness of the concave mold, convex mold fixing plate, cushion plate, and the free height of the unloading rubber or spring.

5) Determine the gap between the convex and concave molds, and calculate the dimensions of the working parts of the convex and concave molds.

6) For the deep drawing process, it is necessary to determine the deep drawing method (with or without edge rings), calculate the number of deep drawing cycles, and determine the semi-finished product size in the intermediate process.

For certain processes, such as continuous deep drawing of strip, special process calculations are required.


4、 Overall design of the mold

Based on the above analysis and calculation, the overall design of the mold structure is carried out (usually only a sketch is needed at this time), and the closing height of the mold is preliminarily calculated to roughly determine the external dimensions of the mold.


5、 Structural design of the main components of the mold

1) A part of the workpiece. The design and selection of fixed forms for structural types such as convex molds, concave molds, and convex concave molds.

2) Locate the component. There are many types of positioning devices commonly used in molds. The selection and design of adjustable positioning plates, fixed blocking pins, movable blocking pins, and fixed distance side edges should be based on specific circumstances.

In the continuous mold, it is also necessary to consider whether to use the initial stopper pin.

3) Unloading and propulsion device. Such as the selection and calculation of rigidity or elasticity, springs and rubber, etc.

4) Guiding components. For example, guide columns, guide sleeve guides or guide plate guides, middle guide columns, side rear guide columns or diagonal guide columns, sliding guide sleeves or ball guides with steel balls, etc.

5) Support and clamp parts, fasten parts. For example, the selection of mold handles, upper and lower mold seat structure types, etc.


6、 Selected stamping equipment

The selection of stamping equipment is an important component of process design and mold design. The reasonable selection of equipment has a great impact on ensuring the quality of workpieces, improving productivity, and ensuring operational safety, and also brings convenience to mold design.

The choice of stamping type mainly depends on the process requirements and production batch.

The determination of stamping equipment specifications mainly depends on process parameters and mold structure dimensions. For crank presses, the following requirements must be met:

1) The nominal pressure of the press must be greater than the stamping process force.

More precisely, the load curve of the stamping process must be lower than the allowable load curve of the press.

For deep drawn parts, it is necessary to calculate the drawing work.

2) The installation height of the press must meet the requirements of the clamping height.

3) The stroke of the press should meet the requirements of workpiece forming. For the press used in the deep drawing process, its stroke must be 2-2.5 times higher than the height of the workpiece during this process in order to insert the blank and remove the workpiece.

4) The size of the press table must be larger than the overall size of the mold base, and leave a position for fixing the mold. Generally, if each side is larger than 50-70 mm, the size of the leakage hole on the press table must be larger than the size of the workpiece (or waste).


7、 Draw a general drawing of the mold

The drawing of the overall mold drawing (including part and workpiece drawings) strictly follows the drawing standards (GB/T4457~GB/T4460 and GB/T131-1993). At the same time, in actual production, the layout of its drawings has formed certain habits based on the working characteristics of the mold and the needs of installation and adjustment.

The overall drawing of the mold includes:

1) Main view. Draw the outline of the mold at the work position. Usually, half of the blank positions are drawn before drawing the stamping (when the punch slider is at the top dead center position); The other half is drawn at the bottom dead center position after stamping, indicating that the workpiece has already been formed (or separated).

2) Top view. Usually, the top view of the half and the top view of the upper half are drawn by the other half. As needed, the top view of the lower part is sometimes fully drawn.

3) Side view, bottom view, and partial sectional view, etc. If necessary, draw a side view of the working position of the mold. Sometimes, the bottom view and partial sectional view of the upper part of the mold are also drawn in the upper right corner of the drawing.

4) Workpiece diagram. The general workpiece drawing is located in the upper right corner. For the work done on several sets of molds, in addition to drawing the workpiece diagram for this process, it is also necessary to draw the workpiece diagram for the previous process.

5) Layout diagram. For progressive dies, it is necessary to draw the layout, process arrangement sequence, and stamping content completed in each process step; The spacing between work steps, overlap value, and strip size should be marked. In the layout diagram of the punching die, the layout method, the size of the strip material, and the size of the overlap value should be marked.

6) List the parts list, specifying the materials and quantities. All standard parts should be selected according to specifications.

7) Technical requirements and instructions. Technical requirements include the press machine, equipment model, overall tolerance of the mold, assembly, installation and debugging, mold closure height, mold clearance, and other requirements.


8、 Draw part drawings for each non-standard component

All dimensions, tolerances, matching, shape and position tolerances, surface roughness, materials, heat treatment requirements, and other technical requirements should be indicated on the part drawing.


9、 Fill in the mold record card and prepare the stamping process document

For small-scale production, a process route list should be filled out; During large-scale production, it is necessary to create process cards and process cards for each component.

News Related news
日韩中文字幕精品视频_国产精品视频免费在线_欧美在线欧美在线_国产一区在线免费
免费av在线一区| 激情网站五月天| 日韩亚洲国产中文字幕| 91成人在线视频观看| 77777亚洲午夜久久多人| 91国语精品自产拍在线观看性色| 99久久国产综合精品五月天喷水| www.av蜜桃| 7777精品视频| 久久久久久久久久久成人| 91好吊色国产欧美日韩在线| 久久频这里精品99香蕉| 91国产高清在线| 国产成人高清激情视频在线观看| 久久久久久有精品国产| 久久深夜福利免费观看| 国产精品裸体一区二区三区| 九九久久精品一区| 亚洲欧洲三级| 日本欧美中文字幕| 黄页免费在线观看视频| 国产欧美日韩视频| 国产脚交av在线一区二区| 久久久久久久av| 国产精品久久中文字幕| 精品久久久久久久久久中文字幕| 宅男一区二区三区| 日韩avxxx| 国内精品视频久久| 成人做爽爽免费视频| 国产精品69久久| 久久精品国产欧美激情| 欧美精品一二区| 日韩av大片在线| 韩国日本不卡在线| 91九色精品视频| 久久久久久欧美精品色一二三四| 国产精品久久久久久久久久小说| 欧美精品久久久久久久| 日本新janpanese乱熟| 欧洲成人免费视频| 国产精品永久免费在线| 久久久www免费人成黑人精品| 国产精品视频500部| 亚洲影院色在线观看免费| 欧美综合国产精品久久丁香| 国产精品一二区| 日韩亚洲精品视频| 亚洲综合精品一区二区| 欧美老熟妇喷水| 久久综合中文色婷婷| 久久中文久久字幕| 日韩中文字幕av在线| 欧美老熟妇喷水| 久久免费一区| 精品国产乱码久久久久久郑州公司| 亚洲**2019国产| 国产一级做a爰片久久毛片男| 久久精品日韩| 中文字幕一区二区三区最新| 黄色三级中文字幕| 久久久久久久久久久久久9999| 这里只有精品66| 国内精品400部情侣激情| 九色91在线视频| 亚洲精品无人区| 国产伦精品一区二区三区精品视频| 久久久999成人| 日韩欧美一区二区三区四区| 成人av播放| 国产精品美女免费视频| 人妻无码一区二区三区四区| 久久青青草原| 亚洲成人av动漫| 苍井空浴缸大战猛男120分钟| 久久精品视频99| 日韩精品国内| 久久国产乱子伦免费精品| 午夜午夜精品一区二区三区文| 国产色综合一区二区三区| 国产精品久久久久久五月尺 | 国产成人精品综合久久久| 亚洲一区尤物| 国产综合第一页| 国产精品久久久久久搜索| 青青草成人网| 日韩在线www| 日韩久久久久久久久久久久| 国产成人av在线播放| 欧美一级片中文字幕| 久久久在线观看| 色欲色香天天天综合网www| 久久久水蜜桃| 日本国产欧美一区二区三区| 国产成人高潮免费观看精品| 日韩在线视频在线| 久久一区二区三区av| 性日韩欧美在线视频| 91精品国产91| 无码内射中文字幕岛国片| 久久人妻精品白浆国产| 日本高清不卡在线| 久久国产精品精品国产色婷婷| 日韩高清av| 国产成人久久久精品一区| 国内精品久久久久久久久| 精品久久久久久无码国产| 国产伦精品一区二区三区免| 一本二本三本亚洲码| 久久久欧美精品| 日韩欧美一区二| 国产精品毛片va一区二区三区| 国产日韩欧美精品在线观看| 精品国产91亚洲一区二区三区www| 成人乱人伦精品视频在线观看| 亚洲精品欧美日韩专区| 久久久久久久久中文字幕| 欧美精品在线一区| 欧美成人精品影院| 国产精品999视频| 欧美xxxx黑人又粗又长密月 | 久久天天躁狠狠躁夜夜av| 国产视频一区二区视频| 亚洲欧洲国产精品久久| 日韩在线视频网站| 国产色综合天天综合网| 日韩在线国产| 精品国产拍在线观看| 蜜桃av噜噜一区二区三区| 中文字幕在线中文| 国产成人无码一二三区视频| 国产在线不卡精品| 少妇免费毛片久久久久久久久| 国产精品视频二| 91高潮精品免费porn| 蜜桃视频成人在线观看| 午夜精品一区二区三区在线| 精品激情国产视频| 97精品国产97久久久久久免费| 欧美在线中文字幕| 综合久久国产| 日韩天堂在线视频| 国产精品自产拍在线观| 日本成人在线不卡| 中文字幕在线亚洲精品| 久久精品亚洲94久久精品| 91久久国产精品| 国产在线一区二区三区| 日产国产精品精品a∨| 欧美激情综合色| 日韩一二三在线视频播| av免费观看久久| 精品欧美一区二区三区久久久| 中文字幕在线亚洲三区| 久久久精品国产一区二区| 91九色国产在线| 国内精品久久久久久久久| 日日橹狠狠爱欧美超碰| 中文字幕日韩精品无码内射 | 色妞一区二区三区| 国产乱子伦精品| 欧美国产激情视频| 日韩欧美一区二区三区四区 | 日韩一区av在线| 91好吊色国产欧美日韩在线| 国模精品一区二区三区色天香| 日本女人高潮视频| 性欧美亚洲xxxx乳在线观看| 国产99在线|中文| 国产精品旅馆在线| 久久韩国免费视频| 国产不卡一区二区视频| 97精品视频在线观看| 国产精品一区久久| 免费99视频| 精品一区2区三区| 欧美诱惑福利视频| 欧美专区在线观看| 日韩精品一区中文字幕| 日韩亚洲在线视频| 日日鲁鲁鲁夜夜爽爽狠狠视频97| 亚洲乱码中文字幕久久孕妇黑人| 中文字幕日本最新乱码视频| 色中色综合影院手机版在线观看| 精品卡一卡二| 欧美精品一二区| 色在人av网站天堂精品| 欧美激情精品久久久久| 精品国产乱码久久久久久蜜柚| 久久综合久久88| 欧美成人午夜剧场免费观看| 国产精品久久久久91| 国产精品久久久久久久久男| 久久亚洲欧美日韩精品专区| 国产精品久久二区| 久久国产精品电影| 国产精品久久一| 欧美成人精品影院| 中文字幕一区二区三区四区五区| 一区二区三区四区免费视频|